Old Tiles Removal

This bathroom overhaul job required all tiles (x2 sets) to be removed and the wall taken down to the brick for new plasterboarding.
This is serious hard work and required the right skills and tools for safe removal.
A 2 ton skip was filled then the walls were brushed down and ready for the new plasterboard.
 
Before
 
 
 
 
                         After